KUALA LUMPUR, 20 APRIL 2018. Construction of DASH HIGHWAY near Shah Alam. DASH is a 20.1km, three-lane elevated dual-carriage expressway running from Puncak Perdana U10 Shah Alam Interchange to the Penchala Interchange. — Stock Editorial Photography
L
2000 × 1334JPG6.67 × 4.45" • 300 dpiStandard License
XL
3283 × 2189JPG10.94 × 7.30" • 300 dpiStandard License
super
6566 × 4378JPG21.89 × 14.59" • 300 dpiStandard License
EL
3283 × 2189JPG10.94 × 7.30" • 300 dpiExtended License
KUALA LUMPUR, 20 APRIL 2018. Construction of DASH HIGHWAY near Shah Alam. DASH is a 20.1km, three-lane elevated dual-carriage expressway running from Puncak Perdana U10 Shah Alam Interchange to the Penchala Interchange.
— Photo by tuahlensa- Authortuahlensa
- 192801182
- Find Similar Images
- 4.5
Editorial Photo Keywords:
- construction
- technology
- develop
- concrete
- semi
- urban
- engineering
- working
- digging
- excavator
- freeway
- dig
- barrier
- construct
- new
- machine
- paving
- vehicle
- dirt
- job
- digger
- infrastructure
- ground
- build
- dash
- excavate
- worker
- truck
- development
- highway
- architecture
- shovel
- motorway
- road
- soil
- transportation
- street
- heavy
- machinery
- site
- excavation
- editorial
- traffic
- earth
- industry
- industrial
- work
- equipment
- asphalt
- bulldozer
Same Series:
Usage Information
You can use this royalty-free editorial photo "KUALA LUMPUR, 20 APRIL 2018. Construction of DASH HIGHWAY near Shah Alam. DASH is a 20.1km, three-lane elevated dual-carriage expressway running from Puncak Perdana U10 Shah Alam Interchange to the Penchala Interchange." for personal and non-commercial purposes according to the Standard License. This stock image may be used to illustrate stories in newspaper and magazine articles and blog posts. Please note that editorial stock photos may not be used in advertising or promotional material.
You can buy this editorial photograph and download it in high resolution up to 3283x2189. Upload Date: Apr 21, 2018