Ground beam under constraction at the construction site — Stock Photo, Image

Ground beam under constraction at the construction site — Photo

MALACCA, MALAYSIA -NOVEMBER 20, 2016: Ground beam under construction at the construction site at Malacca, Malaysia during daytime. Daily activity is ongoing.

 — Photo by Aisyaqilumar

Same Series:

SEPANG, MALAYSIA -MAY 06, 2014: Pile cap foundation work on progress at the construction site. Construction workers excavate holes to start fabricating the pile cap capping.
Sepang Malaysia May 2014 Pile Cap Foundation Work Progress Construction — Stock Photo, Image
KUALA LUMPUR, MALAYSIA -JULY 18, 2018: Construction workers installing & fabricating timber form works at the construction site. The formworks made from timber and plywood.
Kuala Lumpur Malaysia July 2018 Construction Workers Installing Fabricating Timber — Stock Photo, Image
KUALA LUMPUR, MALAYSIA -JUNE 13, 2016: Construction site in progress Malaysia during daytime. Daily activity is ongoing.
Kuala Lumpur Malaysia June 2016 Construction Site Progress Malaysia Daytime — Stock Photo, Image
SERDANG, MALAYSIA -APRIL 1, 2017: Building ground beam under construction. Made from steel reinforced concrete and the mold made from timber and plywood. Constructed by workers.
Building ground beam under construction. — Stock Photo, Image
CYBERJAYA, MALAYSIA -JANUARY 10, 2020: Earthworks for the new development area. Slope trimmed by heavy machinery. Surveyor help to peg required platform level. Machinery used to cut or fill the earth.
Cyberjaya Malaysia January 2020 Earthworks New Development Area Slope Trimmed — Stock Photo, Image
SEPANG, MALAYSIA -MAY 06, 2014: Pile cap foundation work on progress at the construction site. Construction workers excavate holes to start fabricating the pile cap capping.
Sepang Malaysia May 2014 Pile Cap Foundation Work Progress Construction — Stock Photo, Image
PERAK, MALAYSIA -JULY 04, 2016: Earthworks at the construction site by construction heavy machine to get the required platform level. It is carried out before construction starts.
Perak Malaysia July 2016 Earthworks Construction Site Construction Heavy Machine — Stock Photo, Image
PENANG, MALAYSIA -JUNE 18, 2021: Structural works are underway at the construction site. Construction workers are installing formwork made of metal or timber. Safety features are paramount.
Penang Malaysia June 2021 Structural Works Underway Construction Site Construction — Stock Photo, Image
JOHOR, MALAYSIA -APRIL 10, 2015: Pile cap form work with reinforcement bar in it at the construction site in Johor, Malaysia.
Pile cap form work with reinforcement bar in it — Stock Photo, Image
View of the construction site in progress at Selangor, Malaysia.
Construction site in progress in Malaysia — Stock Photo, Image
KUALA LUMPUR, MALAYSIA -AUGUST 16, 2018: An aerial image of the construction site where the column is actively provided on the slab for the next level. Workers are working in stages.
Kuala Lumpur Malaysia August 2018 Aerial Image Construction Site Column — Stock Photo, Image
MALACCA, MALAYSIA -MARCH 09, 2017: Group of construction workers pouring wet concrete using concrete bucket transported by tower crane and pour it into timber formwork at the construction site.
Malacca Malaysia March 2017 Group Construction Workers Pouring Wet Concrete — Stock Photo, Image
KUALA LUMPUR, SEPTEMBER 17, 2015: Building ground beam reinforcement bar and formwork fabricated at the site by construction workers. Concrete will be poured into it after satisfied by the engineer.
Kuala Lumpur September 2015 Building Ground Beam Reinforcement Bar Formwork — Stock Photo, Image
KUALA LUMPUR, MALAYSIA -JULY 17, 2019: Heavy machinery doing the soil backfilling work at the construction site. Works carried out before building construction starts to get the required levels.
Kuala Lumpur Malaysia July 2019 Heavy Machinery Doing Soil Backfilling — Stock Photo, Image
SEPANG, MALAYSIA -MAY 06, 2014: Pile cap foundation work on progress at the construction site. Construction workers excavate holes to start fabricating the pile cap capping.
Sepang Malaysia May 2014 Pile Cap Foundation Work Progress Construction — Stock Photo, Image
MALACCA, MALAYSIA -NOVEMBER 20, 2016: Ground beam under construction at the construction site at Malacca, Malaysia during daytime. Daily activity is ongoing.
Ground beam under constraction at the construction site — Stock Photo, Image

Usage Information

You can use this royalty-free photo "Ground beam under constraction at the construction site" for personal and commercial purposes according to the Standard or Extended License. The Standard License covers most use cases, including advertising, UI designs, and product packaging, and allows up to 500,000 print copies. The Extended License permits all use cases under the Standard License with unlimited print rights and allows you to use the downloaded stock images for merchandise, product resale, or free distribution.

You can buy this stock photo and download it in high resolution up to 3264x2328. Upload Date: Jan 21, 2017